- Ensure that time slot is booked in calendar on your project name.
- Check that application is working manually.
- Check whether the entire server’s are up and in normal condition.
- If in SiteScope the values against summary of any server are ‘NA’ then restart those servers.
- If time permits run each script individually for five iterations in VuGen.
- Refresh the script in Performance Center with the latest version.
- Check the runtime settings of each script.
- Check the scenario settings and number of users configured for each script with workload Model.
- Check for IP Spoofing whether enabled or disabled and change it as per the requirement.
- Before starting the scenario verify that each script duration, ramp up and ramp down time is correct.
- Check whether Monitor profiles are configured correctly.
- Check whether windows profilers are added.
- Book the same time slot in Performance Center and manually select Load Generators and Controller.
- Configure number of Load Generator, Controller as per allocated in time slot and take only those Generators and Controller, which are free.
- When ready to run the test send an alert mail to all related groups.
Friday, August 26, 2011
Prerequisite of Load Test Execution